|

Teleman Certified Operation Support Engineer
Module – 01 : O & M of SMPS Power Plant
- SMPS Technology
- SMPS Features and components
- SMPS for MSC and BTS Sites
- Active Operation & Maintenance of SMPS
- SMPS Troubleshooting procedure
- LVD and servo stabilizers
- Active O & M practice
- Troubleshooting Procedure in SMPS
- Safety in Power Plants
Module-02 : O & M of batteries
- Overview of batteries for telecom system
- Major components and battery bank
- Types of battery bank and capacities
- Initial charging & Discharging
- VRLA battery Performance and Monitoring
- Battery Troubleshooting
- Battery Maintenance Practice
Module-03 : O & M of DG Set
- Working principles of DG set
- DG set sizing, rating and component parts
- DG set Fuel and Lubrication system
- Cooling System
- DG set Maintenance and Trouble shooting
- AMF Panel
Module-04 : O & M of Package AC and Earthing
- Overview of PAC, Flow Diagram
- PAC types and makes
- Unit design and components
- Unit specifications & Maintenance
- Earthing and it’s classes
- Earth electrode systems and Testing
MODULE – 05 : Fiber Optic Cables, Test and Measurements
- Optical Fiber Principles and Profile
- OFC Types and construction
- Optical Fiber Cable Splicing methods
- Fiber Management Systems
- Fiber Optic Connectors and Couplers
- OFC Test and Measurements
Module-06 : Safety from High Voltages and Fiber handling
- Fundamentals of Safety
- Responsibilities-Safety while Handling High Voltages
- Safety Devices
- Inspection of Safety Equipment
- DO’s and DON’Ts of Electricity Safety
- Removal of victim from contact
- First Aid-Immediate action to recover the patient
- Direct Artificial Respiration
- First care for Electric Burn
- Handling of Devices Sensitive to Static
- Hand and Arm Protection
- Head Protection
- Foot and Leg Protection
- Care of Optical Fibers
- Eye safety
+ 30 Hours Onsite Training
Students will undergo 30 Hours (3 days) of practical on-site training at Indore. The on-site lab is installed with all live equipments such
as SMPS Power Plant, Battery Bank, DG Set, Package AC, Earthing system and OFC Splicers, Tester etc, which help in bringing world class telecom infrastructure training
facility within reach of students.
|